Sewage Installation
Health Department
Record NumberSEWAGE 19-0259P
Closed
    Current Fees
$0.00
Additional fees may be required
     
 

Project Information  

Location  
380 Davison Head Dr Parcel
Friday Harbor, WA 98250 461452029000
 
 
Created 6/28/2021
Submitted 6/28/2021
Approved 9/22/2022
Issued 11/30/2022
Closed 11/30/2022
Application Expires 3/21/2023
 
 
 
 
Notes 1 Note

Project Notes: Briefly explain the scope of your project and your intentions. Include enough information for staff to review and properly categorize your permit. Blank pages will be rejected.

11/22/2022
Document Note
APPROVED DESIGN AND INSTALLATION
Attachments:
19-0259.pdf

 
Contacts  

Contact Role  
JAMES M & TANA D RIDGEWAY(view notes)
jim@leewardfp.com
Phone number not on record

Submitter of the Application
   
JAMES M & TANA D RIDGEWAY(view notes)
jim@leewardfp.com
Phone number not on record

Owner of Record
   

Contractors  

Contractor License Number Primary  
MEM ENTERPRISES LLC (view notes)
brandon@mementerprises.com
66 WALLY WAY
FRIDAY HARBOR, WA 98250
MEMENEL915KM
Expires On: 3/18/2027
 

We have not hired a contractor for this project
Details  

Please enter the following details about your project. Items with a red asterisk are required.

(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
(view notes)
Submittals At least 1 file must be uploaded for each submittal requirement  

To upload items, click the blue 'Upload' link on the left. In the window that appears next, click on the white 'Add Files' button and select the appropriate files. Then click the blue 'Begin Upload' button. Click on 'Close' when the upload is complete. Repeat for each submittal that is required and/or relevant to your application. For construction projects, please combine construction plans and drawings into one PDF file. It is preferred to keep the site and profile plans in their own submittal lines for easy retrieval during application review.

*Required for Application
Required before application can be closed
Submittal Name Received Version Status
Permit application - not required. If you have prepared an application, you can upload it here. (view notes)9/1/2022 1 Approved  
Record Drawing* (view notes)9/1/2022 1 Approved  
Start-Up Permit Card* (view notes)9/1/2022 1 Approved  
Parcels  

Parcel(s) associated with your permit.

Parcel Number Primary Owner Primary Address
461452029000 (view notes) JAMES M & TANA D RIDGEWAY 380 Davison Head Dr Friday Harbor, WA 98250
Conditions  

Pre-Installation Meeting with Designer  (view notes) Verified on 6/30/2022
Watertight Testing (All tanks)  (view notes) Verified on 4/8/2021
Mound Bed Preparation (if applicable)  (view notes) Verified on 11/22/2022
Pressure Test (if applicable)  (view notes) Verified on 11/22/2022
System Installation (Infiltration surface level-Ok to cover)  (view notes) Verified on 6/30/2022
System Start-up (Non-Proprietary Systems)  (view notes) Verified on 10/27/2021
Fees Current Fees $0.00

Current fees for your permit are an estimate until the application has been submitted. Final amount due will be calculated upon submission of your completed application.

Fee Amount Paid Balance Due Now
Total $ 0.00 $ 0.00 $ 0.00 $ 0.00
Approval Steps Follow the approval process

These permit workflow steps reflect the most current updated status and are linked directly to the permit software used by County staff. FOR EXAMPLE: Pending: (not yet reviewed). Approved with conditions: (This step has been approved with conditions required for closure. This is the standard approval we use, the conditions are listed on the permit upon issuance) HOLD: (Review on HOLD until further further information is submitted by applicant.)

Step Status Date
Environmental Health Review (view notes) Approved 9/22/2022